Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model |
TC30 |
TC50 |
TC90 |
TC135 |
TC170 |
TC225 |
TC315 |
TC450 |
|
Max. hook load kN(1bs) |
300 (66000) |
500 (110000) |
900 (200000) |
1350 (300000) |
1700 (37400) |
2250 (500000) |
3150 (700000) |
4500 (1000000) |
|
Dia. of wireline mm(in) |
24 (15/16) |
24 (15/16) |
26 (1) |
29 (1 1/8) |
29 (1 1/8) |
32 (1 1/4) |
35 (1 3/8) |
38 (1 1/2) |
|
OD of sheave mm(in) |
475(18 3/4) |
610 (24) |
660 (26) |
1005 (40) |
1005 (40) |
1120 (44) |
1270 (50) |
1524 (60) |
|
Qty. of sheave |
4 |
5 |
5 |
5 |
6 |
6 |
7 |
7 |
|
Overall dimensions mm(in) |
Length |
738 (29) |
860(33 7/8) |
1208 (47 9/16) |
2320 (91 11/32) |
2668(105) |
2668 (105) |
3112 (123) |
3407 (134) |
Width |
472 ( 18 5/8 ) |
670 (26 7/16) |
1092 (43) |
1436 (56 17/32) |
2460 (97) |
2709(107) |
2783(110) |
2722(107) |
|
Height |
575(22 5/8) |
588 (23 1/8) |
1207 (47 1/2) |
1781 (70 1/2) |
1855 (73) |
2469 (97) |
2800(110) |
2856(112) |
|
Weight kg(1bs) |
245 (540) |
464 (1023) |
1500(3307) |
2775(6118) |
4540(9988) |
5270 (11594) |
7600 (16720) |
9750 (21450) |
Our factory is equipped with cutting-edge production lines, comprehensive gold processing, heat treatment, and pretreatment equipment, alongside complete testing systems and facilities. The full spectrum of casting, heat treatment, metalworking, final assembly, and inspection is meticulously organized in-house, ensuring comprehensive and controllable product quality. With professional engineer support, an efficient sales team, and competitive pricing, we attract customers worldwide.
Q1: What's your Product Range? |
various kinds of oilfield equipment, including oil drilling equipment and accessories, drilling tools, petroleum drill pipe and pipe, instruments and meters and accessories, O C T G, wellhead and downhole tools and spare parts, electrical and mechanical equipment. |
Q2: Do you inspect the finished products? |
Yes. Each step of production and finished products will be carried out inspection by QC department before shipping. |
Q3:How do you ship the finished products? |
By sea |
By air |
Q4:What is your average lead time? |
Peak Season Lead Time: 1-3 months |
Off Season Lead Time: within 15 workdays |
Q5:How long is your warranty? |
1 year |